Inspection & measurement

Automatic Bearing Clearance Measuring Machine

Component feeding · Visual inspection · Rotation check · Radial clearance measurement

Discuss your project ↗

Equipment features

Detailed process flow

Detailed process flow

  1. 01Component feeding
  2. 02Visual inspection↳ NG rejection
  3. 03Rotation check↳ NG rejection
  4. 04Radial clearance inspection↳ NG rejection
  5. 05Discharge

Process sequence depends on the bearing and selected configuration. Inspection and optional stations are agreed during technical review.

Reference configurations

Technical specifications

Technical parameter22–62 mm62–90 mm90–130 mm
Processing range22mm-62mm62mm-90mm90mm-130mm
Cycle time≤5 s≤6 s≤7 s
Measurement accuracy≤1 μm≤1.5 μm≤2 μm

Reference values from the supplied catalog. Confirm the applicable bearing dimension, component specification and operating conditions with our team. Final specifications are agreed for each quotation.

JIANRONG / ENGINEERING

Start with your bearing.

Send bearing designations and component drawings, target output, inspection requirements and the installation country. We will review the process and discuss a suitable configuration.

Discuss your project ↗

derekyang1225@gmail.com

Explore related equipment

View full directory ↗

Equipment comparison

Reference values from the supplied catalog. Confirm the applicable bearing dimension, component specification and operating conditions with our team. Final specifications are agreed for each quotation.